Advertisement
Top Leaderboard
728 × 90 px • CLS-Locked
Unit ConvertersEnergy & Solar

Electricity Bill & Solar Net-Metering Estimator

Estimate electricity utility bills with Protected/Unprotected slabs, fuel adjustments, taxes, and Solar Net-Metering ROI.

Instant browser processing Private & Auto-Purged

🔒 100% Client-Side Utility Computation • NEPRA 2024-2025 Tariff Schedules

Your data is computed entirely inside your browser's JavaScript engine and is never sent to our servers.

WAPDA / DISCOs Electricity Bill & Solar Net-Metering Estimator

Official NEPRA Domestic Slabs, FPA, Taxes, and Green Solar ROI Calculator

Coverage: Lahore, Kasur, Okara, Sheikhupura

Standard progressive slab tariff (1 to >700 units)

Normal residential slabs (16.48 to 42.72 Rs/unit)

kWh / Units
Quick Presets:

Solar Net-Metering & Green Energy Offset

Simulate excess solar kWh exported to grid and net billing deductions

Estimated Total Bill

کل تخمینہ شدہ بجلی کا بل

LESCO
Rs. 17,725

Effective Rate per Unit

اوسط فی یونٹ لاگت

All Taxes Included
Rs. 50.64 / kWh

Base Energy Charges

بنیادی بجلی کا خرچ

Unprotected
Rs. 12,450

Active Tariff Slab

لاگو شدہ ٹیرف سلیب

Unprotected 🔴
Unprotected Slab

WAPDA Bill Cost Composition & Tax Breakdown

Total: Rs. 17,725
Base Energy: Rs. 12,450 (70%)
FPA Surcharge: Rs. 1,225 (7%)
FC Surcharge: Rs. 1,131 (6%)
GST & Taxes: Rs. 2,921

Official Itemized Bill Charges Breakdown

LESCO

Base Energy Cost

بنیادی بجلی کا خرچUnprotected (301 - 700 Units @ Rs. 35.57)

Rs. 12,450

Fuel Price Adjustment (FPA)

فیول پرائس ایڈجسٹمنٹ (ایف پی اے)@ Rs. 3.50/unit

Rs. 1,225

Financing Cost (FC) Surcharge

فنانسنگ کاسٹ سرچارج@ Rs. 3.23/unit

Rs. 1,131

Electricity Duty (ED)

الیکٹرسٹی ڈیوٹی1.5% of base energy cost

Rs. 187

General Sales Tax (GST)

جنرل سیلز ٹیکس (جی ایس ٹی)18% statutory sales tax

Rs. 2,699

PTV / Radio Fee

پی ٹی وی فیسRs. 35 fixed monthly fee

Rs. 35

Net Estimated Payable Bill (PKR)

17.73 Thousand17.73 ہزار روپے

Rs. 17,725
Share electricity bill breakdown with family or tenants:

NEPRA 2024–2025 Tariff Slab Rates

Protected Domestic Slabs

1 - 50 Units (Life-Line)Rs. 3.95
1 - 100 Units (Protected)Rs. 7.74
101 - 200 Units (Protected)Rs. 14.16

Unprotected Domestic Slabs

1 - 100 UnitsRs. 16.48
101 - 200 UnitsRs. 22.95
201 - 300 UnitsRs. 27.14
301 - 700 UnitsRs. 35.57
Above 700 UnitsRs. 42.72

Three-Phase Time of Use (ToU)

Peak Hours (4 hrs daily)Rs. 42.00
Off-Peak Hours (20 hrs daily)Rs. 35.50
Solar Export Buyback RateRs. 24.50

Frequently Asked Questions (Electricity Billing & Solar Net-Metering in Pakistan)

Advertisement
In-Content Native Banner
728 × 90 px • CLS-Locked

How to Convert with Electricity Bill & Solar Net-Metering Estimator

Follow these 3 simple steps to complete your conversion in seconds.

1
Step 1 of 3

Enter Input Value

Type the numerical amount you want to convert into the input field.

💡 Tip: Supports standard decimal notation.
2
Step 2 of 3

Choose Conversion Parameters

Adjust target quality, output format, or unit settings as needed.

3
Step 3 of 3

Get Instant Output & Share

View your real-time calculated result, copy to clipboard, or share directly via WhatsApp.

Electricity Bill & Solar Net-Metering Estimator Mathematical Formula & Conversion Logic

Formula representation used for accurate calculations:

Target Value = Source Value × Conversion Coefficient
Calculation Example: 1 Unit = Standard multiplier applied with floating-point precision arithmetic.

Electricity Bill & Solar Net-Metering Estimator Quick Conversion Reference Matrix

Quick reference lookup table for standard unit calculations.

Input UnitCalculated Output
1 UnitStandard Ratio
5 Units5× Ratio
10 Units10× Ratio
25 Units25× Ratio
50 Units50× Ratio
100 Units100× Ratio

Frequently Asked Questions

Common questions and answers about Electricity Bill & Solar Net-Metering Estimator.

Electricity units (kWh) are calculated by subtracting your Previous Meter Reading from your Current Meter Reading on your DISCO bill. For three-phase Time-of-Use (ToU) meters, Peak and Off-Peak units are recorded separately on different registers (01 and 02) and billed at their respective NEPRA slab rates.